A transformer can pass an insulation resistance check and still be wet. That is the first thing to understand about a transformer insulation resistance test: the reading on its own proves very little, and the number that matters is the one you compare it against — another phase, another test, or the same unit last year.
Insulation resistance and the polarization index derived from it are the cheapest diagnostic measurements available on a transformer. They take ten minutes, need no special equipment beyond a megohmmeter, and they detect moisture, surface contamination and gross insulation degradation earlier than almost anything else. What they do not do is measure dielectric strength. A unit that reads thousands of megohms can still flash over at its partial discharge inception voltage.
This guide covers what the instrument actually measures, how to choose the test voltage, how to correct for temperature so that two readings mean the same thing, what the acceptance values are and where they come from, and how to read IR and PI together instead of separately.
What the Megohmmeter Measures
A megohmmeter applies a steady DC voltage across an insulation path and measures the resulting current, then reports the quotient as resistance. The current has three components, and only one of them is the one you care about.
- Capacitive charging current — the transformer winding and bushing capacitance charging up. Large at the instant the voltage is applied, gone within seconds.
- Dielectric absorption current — molecular dipoles in the paper and oil realigning with the field. This decays slowly, over several minutes, and it is the entire physical basis of the polarization index.
- Conduction or leakage current — the steady current that crosses the insulation bulk and creeps over its surface. This is the one that rises when the insulation is wet, dirty or degraded.
Because the absorption component is still decaying at one minute, the one-minute reading is not a stable property of the insulation. It is a reading taken at an arbitrary moment while two of the three currents are still changing. That is why the same transformer gives different values at 15 seconds, 1 minute and 10 minutes — and why the ratio between them carries information that a single value cannot.
Test Voltage by Winding Rating
The test voltage is selected from the winding’s rated voltage, not from the system voltage and not from whatever range the instrument happens to have. IEEE 43 gives the standard ladder, and it applies to transformer windings in the same way as to machine windings:
| Winding rated voltage | DC test voltage | Typical application |
|---|---|---|
| Below 1 kV | 500 V | LV windings, control and auxiliary circuits |
| 1 kV to 2.5 kV | 500 V to 1,000 V | 3.3 kV class windings |
| 2.5 kV to 5 kV | 1,000 V to 2,500 V | 6.6 kV and 7.2 kV class windings |
| 5 kV to 15 kV | 2,500 V to 5,000 V | 10 kV, 11 kV, 20 kV and 33 kV class windings |
| Above 15 kV | 5,000 V to 10,000 V | 66 kV and above |
Two practical rules sit on top of the table. Use the same test voltage every time you test a given unit, because insulation resistance is not linear with applied voltage and a change from 2,500 V to 5,000 V will move the reading for reasons that have nothing to do with the insulation. And never raise the test voltage on an old or suspect unit to “get a clearer reading” — if the insulation is already degraded, the test itself can be the event that breaks it down.
Test Connections and the Guard Terminal
A transformer offers several insulation paths, and each one answers a different question. Testing only one of them and reporting “IR good” leaves most of the insulation unexamined.
| Measurement | Connection | What it tests |
|---|---|---|
| HV to earth | HV winding to line, LV winding and tank to earth | HV winding to core, tank and frame — the main path |
| LV to earth | LV winding to line, HV winding and tank to earth | LV winding to core and frame |
| HV to LV | HV winding to line, LV winding to earth, tank guarded | Inter-winding insulation, which no earth test reaches |
| Core to earth | Core clamp to line, tank to earth | Core earthing integrity and core insulation |
The guard terminal is what makes these measurements meaningful on a dirty transformer. Surface leakage across dusty bushings or an oily tank top runs in parallel with the bulk insulation, and at high resistance levels it can dominate the reading entirely. Connecting the guard terminal to a conductive collar around the leakage path diverts that current away from the measurement, so the instrument reports the bulk path only.
If a reading improves dramatically when the guard is connected, the problem is surface contamination rather than insulation failure — clean the bushings and repeat before drawing conclusions. A reading that does not change with the guard tells you the leakage is genuinely through the insulation.
Temperature Correction Before Any Comparison
Insulation resistance roughly halves for every 10 °C rise in temperature. A reading of 4,000 MΩ at 20 °C becomes about 1,000 MΩ at 40 °C with nothing changing in the insulation itself. Comparing two readings taken at different temperatures without correction is the most common way to reach a wrong conclusion, in either direction.
| Reading temperature | Factor to 20 °C | Factor to 40 °C |
|---|---|---|
| 10 °C | 0.5 | 0.125 |
| 20 °C | 1.0 | 0.25 |
| 30 °C | 2.0 | 0.5 |
| 40 °C | 4.0 | 1.0 |
| 50 °C | 8.0 | 2.0 |
Note the reference temperature. IEEE 43 quotes minimum insulation resistance at 40 °C, because it was written around machine windings that run hot. Transformer field practice and most utility maintenance specifications quote the limit at 20 °C. Both conventions are in use, and a reported value without a stated reference temperature cannot be judged against either. Record the oil temperature, the ambient temperature and the winding temperature at the time of the test, state which reference you are correcting to, and keep the correction factor with the result.

Minimum Insulation Resistance for a Transformer
The classic field rule is that the one-minute insulation resistance, corrected to 40 °C, should be at least the winding’s rated voltage in kV plus one, expressed in megohms. For a 33 kV winding that is 34 MΩ. That figure is a floor for old insulation systems, not a target.
Modern practice uses higher thresholds because modern insulation is capable of much more:
- Below 1 kV, random-wound windings: 5 MΩ minimum at 40 °C.
- Above 1 kV, form-wound or oil-immersed windings: 100 MΩ minimum at 40 °C is the commonly applied floor.
- New oil-immersed transformers: 1,000 MΩ or more at 20 °C is typical of both factory readings and acceptance specifications.
- A unit in service: anything above 10 times the calculated floor is normally judged healthy, provided the trend is flat.
A new transformer usually reads in the thousands of megohms or higher. A unit that reads just above the floor is not necessarily failing, but it is not clean either — borderline values on a new unit usually mean moisture picked up in storage or transport, and the answer is drying before energisation rather than a second test. The available methods and their temperature limits are set out in the guide to transformer drying methods.
Polarization Index: The Ten-Minute Ratio
The polarization index is the ten-minute insulation resistance divided by the one-minute value. In dry insulation the absorption current is still decaying at ten minutes, so resistance keeps climbing and the ratio is high. In wet insulation the leakage current dominates from the start, the curve flattens early, and the ratio collapses toward one.
| Insulation class | Minimum PI | Interpretation |
|---|---|---|
| Class A (105 °C) | 1.5 | Acceptable; below this, suspect moisture |
| Class B, F and H (130 °C and above) | 2.0 | Standard acceptance for modern insulation |
| Any class | Below 1.2 | Wet, contaminated or degraded — investigate before energising |
Two caveats decide whether the number is usable at all. First, when the one-minute insulation resistance exceeds about 5,000 MΩ (5 GΩ), the leakage current is so small that the ratio is dominated by meter resolution and stray effects; the PI is then not a meaningful indicator and should not be reported as a pass or a fail. Second, PI largely cancels the temperature effect, which is exactly why it is useful — but only if both readings are taken in the same test, at the same temperature, with the same voltage.
Dry-type windings behave differently from oil-immersed ones because the insulation system is solid rather than a paper-oil composite. Cast resin and vacuum-impregnated windings typically produce high IR quickly and a PI in the two to three range; a low PI on a cast resin unit points at surface contamination or moisture ingress at the terminals rather than at the winding bulk. The materials side of that is covered in the article on dry-type transformer insulation.
DAR and Absorption Ratio for Shorter Tests
Ten minutes per winding is not always practical, particularly during commissioning when a dozen units are waiting. Two shorter ratios exist, and they are not the same measurement.
The dielectric absorption ratio (DAR) is the 60-second reading divided by the 30-second reading. A value of 1.4 or above is generally taken as acceptable, and below 1.25 as suspect. It compresses the same physics into thirty seconds but is more sensitive to instrument stability and to how the test leads are connected.
In Chinese and IEC-oriented practice a different pair of ratios is standard: the absorption ratio, R60s divided by R15s, required to be 1.3 or above for transformers at 35 kV and below measured at 10 to 30 °C, and the polarization index defined as R600s divided by R60s, required to be 1.5 or above for higher-voltage units. A specification written to that convention and a specification written to IEEE 43 will quote different limits for what looks like the same test, so agree the definition before the first reading is taken.
Reading the Combination of IR and PI
Neither number is diagnostic on its own. The pairs point at different failure modes:
| IR | PI | Most likely condition | Next step |
|---|---|---|---|
| High | 2.0 or above | Dry and healthy | Record as baseline, trend annually |
| High | Below 1.5 | Aged or embrittled insulation, or a test taken too cold | Repeat at stable temperature, then oil test |
| Low | Near 1.0 | Moisture in the insulation | Dry before energising; do not repeat the test hoping for a better number |
| Low | 2.0 or above | Surface contamination or a genuine bulk defect | Clean and retest with the guard connected |
| Falling over time | Normal | Progressive degradation, oil ageing, ingress | DGA and oil quality, then plan intervention |
The trend row matters more than any single threshold. A transformer that reads 3,000 MΩ every year for a decade is healthier than one that read 8,000 MΩ last year and 3,500 MΩ this year, even though both pass. A drop of 50 percent against the previous reading, corrected for temperature, is the point at which the measurement stops being a formality.

When IR falls, the useful companions are dissolved gas analysis and oil quality. Moisture in oil shows up in both, and the DGA interpretation guide covers which gases indicate what. For oil-immersed units the oil-immersed power transformer range is the relevant product context; the test sequence itself is the same whatever the rating.
What a Passing IR Does Not Prove
Insulation resistance is a low-voltage DC screen across the whole insulation bulk. It is blind to anything localised, because a single healthy path in parallel with a defect keeps the total resistance high.
- Turn-to-turn faults. A shorted turn or two changes the ratio and the winding resistance, not the insulation resistance to earth.
- Partial discharge. A void that discharges at 8 kV is not detected by a 2.5 kV DC measurement. That needs a PD test, and the article on partial discharge in cast resin transformers covers the acceptance values.
- Bushing defects. A cracked bushing may read acceptably to earth while flashing over under impulse.
- Weak oil. Oil breakdown voltage and moisture content are separate measurements, and oil can be wet while the solid insulation still measures dry.
IR also does not appear in the dielectric test sequence that proves insulation strength — that sequence is applied voltage, induced voltage, impulse and partial discharge. Treat IR as a diagnostic and an acceptance screen, and specify separately if you want it recorded in a factory test report.
Procedure Checklist for a Field Test
- Isolate, lock off, prove dead and earth all terminals; leave the earth on long enough to dissipate stored charge.
- Disconnect surge arresters, and disconnect the neutral or earthing links that would short the path under test.
- Record ambient, oil and winding temperature before the first reading, not after.
- Clean bushing surfaces if the site is dusty or oily, and connect the guard terminal.
- Apply the test voltage for the full duration and record the reading at 15 s, 60 s and 10 min where a PI is required.
- Discharge the winding for at least four times the test duration before touching any terminal — a 10-minute test leaves a substantial charge.
- Correct both readings to the stated reference temperature and record the factor alongside the result.
The same discipline applies at commissioning. The pre-commissioning checklist puts IR in sequence with ratio, winding resistance and insulation power factor, and the sequence matters because a DC test leaves polarisation that affects the next measurement. Instrument transformers follow the same principles with their own limits, covered in the instrument transformer testing guide.
Frequently Asked Questions
What is a good insulation resistance for a transformer?
For a new oil-immersed unit, 1,000 MΩ or more at 20 °C is normal and much higher is common. For a unit in service, anything above roughly ten times the kV-plus-one floor is healthy, provided the value is stable year on year. A 33 kV winding therefore wants well above 340 MΩ, not the 34 MΩ floor itself.
What polarization index is acceptable?
2.0 or above for Class B, F and H insulation; 1.5 or above for Class A. Below 1.2 the insulation is usually wet or contaminated. Above about 5 GΩ the ratio is not meaningful and should not be used as a pass criterion.
Why is my transformer’s IR low but the PI normal?
That combination usually means surface contamination — dust, oil film or moisture on the bushings — rather than a fault in the winding bulk. Clean the surfaces, connect the guard terminal and retest before scheduling any intervention.
Can I test a transformer while it is energised?
No. The test applies a DC voltage to the winding and requires the winding to be isolated and earthed first. On a live unit the measurement is meaningless and the instrument becomes an arc-flash hazard.
Does temperature affect PI as much as IR?
Far less. The ten-minute to one-minute ratio largely cancels the temperature dependence because both readings move in the same direction. That is the main reason PI is preferred over a single IR value for judging condition, though both readings still need to be taken at the same temperature.
How often should insulation resistance be measured?
Annually for critical units and after any event that could have introduced moisture — a tap changer overhaul, oil handling, a long outage in humid weather, or transport. Establish the baseline on the first reading and judge every later measurement against it.
Using the Numbers
Insulation resistance answers one question well: is there a conductive path through or across the insulation right now. The polarization index answers a second: is that path dominated by moisture. Together they are the quickest way to decide whether a transformer should be energised, dried, or investigated further — and neither of them replaces the dielectric tests that actually prove strength.
Record both values with the temperature they were taken at, correct them to a stated reference, and keep the trend. A transformer with a boring, flat history of IR readings is the one you want; the interesting curve is the one that ends a service life early.